PKN
Fairmont Hotel Prague — Lobby
PKN brought us in as their assembly partner for the lobby of the new Fairmont — working alongside Nüssli and Hanák Contract. Our scope was primarily wall cladding and the complete furniture installation. The project called for an agile partner capable of meeting the exacting standards and tight schedules a five-star hospitality opening demands.
The building, formerly the Hotel Intercontinental, carries heritage protection status. Every method, fixing and finish had to respect the listed fabric of the building — all within a schedule that had several contractors sharing the site at once.
Long-term partnerships are built in moments like these — when the pressure is highest and the margin for error is zero.
"We've collaborated with AllFix across several projects now, and Fairmont was among the most demanding. The heritage constraints alone would have slowed most teams down — they found ways to work within them without ever making it our problem. Deadlines were met, the finish was right, and the hotel opened on schedule."
Pavel Kamenčák · Managing Director · PKN- Location
- Fairmont Hotel, Prague
- Building
- Former Intercontinental, heritage-listed
- Team
- PKN · Nüssli · Hanák Contract
- Scope
- Wall cladding and complete furniture installation
- Year
- 2025